Coastal, port & dredging
Measure coastal works, channels and dredged areas for marine engineering.
What you receive
- Bathymetric and coastal survey drawings
- Pre-/post-dredge models and quantity schedules
- Clearance/obstruction and shoreline maps
- Survey-quality and reconciliation report
When you need it
I need a port, coastal or dredging survey
Who it is for
- Ports and terminals
- Dredging contractors
- Coastal EPC
- Waterways and marine developers
Scope and options
Port and dredging surveys use a controlled hydrographic datum and coverage specification matched to the accepting authority or contract.
Pre/post-dredge quantities come from comparable bed surfaces with documented exclusions and uncertainty.
CRZ/HTL-LTL regulatory demarcation is a specialist statutory scope, distinct from ordinary coastal mapping.
Port, berth and approach-channel survey
Measure marine engineering areas and water depths.
Port access, traffic coordination and survey specification apply.
Pre-/post-dredging reconciliation
Compare bed surfaces before and after dredging.
Contract parties agree the measurement and acceptance basis.
Coastal shoreline and beach-profile monitoring
Record shoreline and coastal-profile change.
Water level and survey conditions affect comparability.
CRZ, HTL and LTL mapping support
Provide measured inputs for coastal regulatory mapping.
Statutory demarcation must be undertaken/adopted through the appropriately authorised agency; Lotusmirk does not self-issue CRZ certification.
Terms explained
- Hydrographic survey
- Georeferenced depth and seabed survey for ports, approaches, dredging and coastal works.
- Pre/post-dredge model
- Comparable bed surfaces used to calculate material removed or remaining.
- Shoreline control
- Survey control linking land, water and engineering datasets in one reference system.
Questions
Will the survey prove that dredging meets the contract?
It can measure the specified bed condition and quantities. Contract acceptance depends on the agreed survey specification and the accepting party.
Is a bathymetric chart an official navigation chart?
Official chart production and navigational acceptance require the competent hydrographic or maritime authority's process.
Can Lotusmirk issue an HTL/LTL or CRZ certificate?
Lotusmirk does not claim that authority. Authorised-agency participation and applicable coastal procedures must be confirmed for statutory work.
Are marine geophysics and metocean included?
They are distinct specialist disciplines and are education-only in this catalogue. A survey brief does not bundle them in as live services.
Method and limits
Agree chart/vertical datum, coverage and the accepting authority's specification.
Keep pre-/post-dredge quantity comparison consistent and traceable.
Separate hydrographic measurement from CRZ demarcation and navigation approval.
Sources
- The Drone Rules, 2021 — G.S.R. 589(E), Gazette of India
Ministry of Civil Aviation / Directorate General of Civil Aviation
- Geospatial guidelines and entity self-certification conditions
Department of Science and Technology
- HTL/LTL mapping manual reference
National Centre for Sustainable Coastal Management
- Hydrographic standards and specifications
International Hydrographic Organization

