Land survey & mapping

Corridor & DPR survey

Measure a route and its surroundings for infrastructure planning.

What you receive

  • Strip plan and route GIS/CAD
  • Longitudinal and cross-sections
  • Terrain model and feature/utility inventory
  • Control and survey report

When you need it

I need a road, rail, pipeline or canal route surveyed

Who it is for

  • Highway and railway EPC
  • Pipelines and power utilities
  • Canal and telecom developers

Scope and options

Corridor surveys are linear-reference datasets built around alignment, chainage, cross-sections, structures and right-of-way context.

DPR support combines survey evidence with discipline-specific design inputs; the survey is one workstream, not the complete DPR.

Pavement metrics such as IRI or rutting require calibrated methods beyond ordinary RGB mapping.

  • Road, rail, canal and pipeline alignment survey

    Measure the proposed or existing linear route.

    Each asset owner may impose access and survey specifications.

  • ROW and acquisition-survey inputs

    Map route boundaries and affected parcels.

    Land acquisition and title decisions remain with the authorised process.

  • Road asset and pavement-condition survey

    Record road assets and surface defects using suitable systems.

    IRI, rutting and other engineering metrics require the specified calibrated equipment; ordinary drone imagery is not a substitute.

  • Route alternatives and spatial suitability

    Compare route constraints using available spatial evidence.

    This is screening, not a statutory approval.

Terms explained

Alignment
The horizontal and vertical route definition for a road, rail, canal, pipeline or utility corridor.
Cross-section
A measured slice across a corridor showing terrain, assets and levels.
DPR survey inputs
Survey information prepared for detailed-project-report design; the full DPR remains a broader engineering scope.

Questions

Does this include a complete DPR?

The base service supplies survey inputs for the corridor. A complete DPR needs separate design, traffic, geotechnical and discipline-specific scope.

Why do you need corridor width as well as length?

Length alone does not define coverage. Survey width, off-route structures and access conditions materially affect capture and processing scope.

Can the same survey support land acquisition?

It can provide spatial inputs. Revenue records, prescribed procedures and competent authority adoption are still required.

Can you inspect road pavement as well?

Visible-condition and asset mapping can be added. Calibrated road-condition measurements require a specialist method and vendor, separately confirmed.

Method and limits

Define alignment length, survey width and required chainage/sections.

Combine surface, ground and utility observations where the route requires them.

Deliver engineering inputs; design and DPR approval remain defined in the agreed scope.