Ground control & engineering survey
Reliable coordinates, levels and setting-out measurements taken on the ground.
What you receive
- Control-point and benchmark register
- Coordinates, levels and observation records
- Setting-out/as-built drawings as scoped
- Adjustment, closure and verification report
When you need it
I need survey points, setting-out or underground utility locations
Who it is for
- Construction and EPC
- Survey and engineering consultants
- Industrial plants and utilities
Scope and options
Static/RTK GNSS, total stations and levelling solve different control and setting-out tasks within one engineering survey network.
A GCP supports aerial mapping; a benchmark controls elevation; a check point independently tests achieved accuracy.
Survey control is meaningful only with a stated datum, coordinate system, observation method and adjustment/closure evidence.
GNSS/DGPS control and CORS-supported positioning
Establish and verify survey reference points.
We state the reference frame and method, and do not use DGPS as an unexplained accuracy claim.
Construction setting-out
Mark design positions and levels on site.
Requires approved design coordinates and agreed tolerances.
As-built verification
Measure constructed positions against the design.
Measurements are not automatic design or structural certification.
GPR and electromagnetic underground utility mapping
Locate buried utilities using specialist ground instruments and records.
Detection is condition-dependent; utilities are exposed only under a separate authorised verification scope.
Aerodrome obstacle survey, OLS and eTOD support
Measure terrain and obstacles for aviation assessment.
The survey follows aerodrome/AAI specifications and does not grant a height clearance.
Terms explained
- GNSS / DGPS
- Satellite positioning methods used to establish survey control, coordinates and levels.
- Total station
- An optical-electronic instrument measuring angles and distances for engineering survey and setting-out.
- GCP
- Ground Control Point: a visible surveyed mark used to control or check aerial mapping.
Questions
Can I request ground survey without a drone?
Yes. The brief keeps the scope ground-only and uses appropriate survey methods.
Do existing DGPS points need to be checked?
Yes. Their datum, condition, provenance and suitability must be checked before they are adopted as control.
Can utility mapping find every underground pipe?
Material, depth, congestion, ground conditions and records affect detection. The report should distinguish measured, interpreted and unverified utilities.
Does an obstacle survey approve my building height?
It provides measurements for assessment. The competent aviation authority decides any required height clearance.
Method and limits
GNSS static/RTK/PPK, total station and levelling selected by task.
Document datum, benchmarks, network adjustment and instrument checks.
Use ground methods where aerial capture cannot meet access or detail requirements.
Sources
- Geospatial guidelines and entity self-certification conditions
Department of Science and Technology
- Surveying and construction method references
Leica Geosystems / Hexagon
- Aerodrome Survey Manual
Airports Authority of India
- Utility-detection systems and combined GPR/EM workflow
Leica Geosystems

