Skip to content
Lotusmirk
Monitoring & emergency response

Construction progress

Create comparable visual and measured records as a project develops.

What you receive

  • Dated progress photography/video
  • Repeat orthomosaics or models as scoped
  • Change and optional quantity comparisons
  • Progress report or project-viewer updates

When you need it

I need regular, comparable updates from my construction site

Who it is for

  • Developers and EPC
  • Project-management consultants
  • Infrastructure owners
  • Lenders' technical advisers

Scope and options

Progress monitoring is repeat reality capture against an agreed baseline, not merely a sequence of photographs.

Quantity change needs compatible survey surfaces; visual completion and contractual milestone certification are separate.

Repeatable viewpoints and spatial references make change review auditable.

  • Repeat aerial progress documentation

    Capture agreed site viewpoints and coverage on reporting dates.

    Weather, access and permissions can alter the programme.

  • Measured earthworks/progress comparison

    Compare survey surfaces or defined quantities.

    Commercial milestone certification is not implied.

  • Fixed-camera time-lapse coordination

    Arrange repeat ground imagery where a suitable partner/site setup exists.

    Camera, connectivity, privacy and maintenance are scoped separately.

  • Progress geoportal or 360 documentation

    Publish approved records in a controlled project viewer.

    Hosting, retention and ongoing updates are defined in the agreed scope.

Terms explained

Repeat capture
Survey or imagery acquired on a consistent basis so change can be compared through time.
Progress baseline
The agreed reference date, drawing or model against which later progress is reviewed.
Quantity change
Measured surface or volume difference where the survey method supports it.

Questions

Does the report certify our contractor's bill?

Repeat imagery and measurements support progress review; contractual payment certification remains with the authorised certifier.

Can you repeat exactly the same images?

The plan aims for comparable viewpoints and coverage. Changing access, structures, weather and safe operating conditions may require documented adjustments.

Do I need a survey every time?

The need depends on the observed condition and agreed investigation method. Visual reporting may be sufficient; quantity or geometric comparisons need suitable repeat measurements.

Can the updates appear in our existing system?

Yes where a supported integration or agreed upload workflow is confirmed. No live integration is claimed until it has been configured and tested.

Method and limits

Repeat agreed viewpoints, coverage and survey references across reporting dates.

Separate visual progress evidence from measured quantities and certified milestones.

Package results for the client's existing review and reporting workflow.

Sources