Visual and thermal line inspection
Observe conductors, fittings, insulation and heat anomalies.
Utility operating controls and electrical stand-off requirements apply.
Inspection & Energy
Inspect power assets and measure their separation from vegetation and surrounding structures.
LiDAR measures conductor, structure and vegetation geometry; visual, thermal and UV-corona sensing address different defect mechanisms.
Clearance values are a survey-state measurement; operating sag and temperature cases belong in the engineering assessment.
Span/tower asset referencing makes repeat inspection and maintenance prioritisation traceable.
Observe conductors, fittings, insulation and heat anomalies.
Utility operating controls and electrical stand-off requirements apply.
Measure separation between mapped conductors and nearby objects.
State the observed condition and any sag/loading assumptions.
Use a dedicated UV sensor to observe relevant discharge indications.
RGB and ordinary thermal cameras do not supply UV-corona measurements.
Screen accessible electrical equipment for abnormal heat patterns.
Competent electrical access and suitable loading are required.
Place a lightweight pilot rope for a utility-controlled installation process.
Separate specialist partner and configuration gate; not a promise to lift heavy conductors.
LiDAR measures geometry. Thermal, visual, UV and electrical tests address different fault mechanisms.
Measured clearances describe the survey condition. Engineering checks must also account for the relevant conductor sag, loading and temperature cases.
Only when a suitable UV-corona system is explicitly included. Thermal imagery alone is not that test.
Only where the utility-approved method, equipment and safety controls permit. Site review determines whether shutdown or other restrictions are needed.
Use visible, thermal, LiDAR and optional UV methods for distinct inspection questions.
Tag observations by tower/span and record the relevant operating conditions.
Separate measured clearances from engineering checks under other loading conditions.
Utility operating controls and electrical stand-off requirements apply.
State the observed condition and any sag/loading assumptions.
RGB and ordinary thermal cameras do not supply UV-corona measurements.
Competent electrical access and suitable loading are required.
Separate specialist partner and configuration gate; not a promise to lift heavy conductors.
Ministry of Civil Aviation / Directorate General of Civil Aviation
Department of Science and Technology
POWERGRID
Your project
Transmission line inspection
Share your project details with our team. The confirmation tells you whether email delivery was accepted.