Blade external visual inspection
Document erosion, cracks and other visible surface indications.
Internal laminate condition requires separately specified testing.
Inspection & Energy
Document accessible blade and turbine-surface defects for maintenance review.
Blade inspection is a repeatable surface-coverage problem: defect location must stay tied to blade, side and spanwise position.
External RGB/thermal evidence does not reveal every internal laminate or lightning-protection defect.
Comparable repeat inspections depend on turbine state, viewpoint and image quality.
Document erosion, cracks and other visible surface indications.
Internal laminate condition requires separately specified testing.
Observe accessible external surfaces and fittings.
This is not a complete mechanical or electrical safety assessment.
Compare repaired locations with prior findings.
Comparable coverage is required; defect closure remains owner/OEM controlled.
Internal damage may not be visible. The owner/OEM determines additional testing and engineering acceptance.
The owner/OEM-approved inspection procedure determines operating state. The website should not promise inspection of moving blades.
Electrical continuity and related tests are distinct from external imagery and require separate equipment and personnel.
Yes, when locations, coverage and image quality are consistently documented. Changes are reported with any comparability limitations.
Use repeatable, asset-referenced coverage of agreed blade and tower surfaces.
Record visible defects, inaccessible areas and review priorities.
Coordinate turbine state, shutdown and access with the owner/OEM.
Internal laminate condition requires separately specified testing.
This is not a complete mechanical or electrical safety assessment.
Comparable coverage is required; defect closure remains owner/OEM controlled.
Ministry of Civil Aviation / Directorate General of Civil Aviation
Yokogawa India
Your project
Wind turbine blade inspection
Share your project details with our team. The confirmation tells you whether email delivery was accepted.